The house was like a beehive this week. A lot of work took place as you can see in these photos. All the windows and the front door frame were completely installed. The insulation on the walls and ceiling were put in place. The outside walls were wrapped with waterproofing construction paper, then metal netting (like chicken wire) was tacked on top of it.
Also, President Rom Sarno welcomed our first visitors, Carlos Mozombite, President of the House of Peru and Lola, Mary and Frank, delegates from the House of Chamorros.